The efficiency of a lift station is defined long before it’s an actual concrete structure that includes valves, pumps, and piping. The design is determined by many variables, including flow calculations, elevation of the site system pressure, the properties of wastewater and temperatures, access to maintenance, controls, and the future capacity.

Image credit: romtecutilities.com
For project owners comparing the best lift station designers, the more useful question isn’t simply who can specify pumps. It’s not about who is able to specify pumps however, but who is able to translate the site conditions and operational requirements into a design that’s easy to construct and operate as well as maintain.
The Limits of Gravity
Gravity is typically the simplest method to transport wastewater. However, terrain and building patterns can make it difficult. It is possible that the new industrial, residential and commercial properties are too large, far away or situated in regions where gravity sewer expansion isn’t feasible.
A lift station will provide the force needed to transfer wastewater from one point in the system of collection to another. The design of a lift station requires understanding both normal operation and more difficult situations like peak flow and pump maintenance equipment breakdown, the possibility of future increases in demand.
Companies considered among the best wastewater engineers should therefore consider the entire conveyance problem rather than treating the station as a single part of the equipment.
Existing infrastructure makes it harder to solve the puzzle
The problem is not the new construction. While maintaining essential wastewater infrastructure municipalities often have to upgrade or replace old stations.
Forcemains, wetwells and other existing components electrical services and controls, site boundary, and downstream Infrastructure can restrict the new design. Engineers must determine which components are reusable as well as what components must be replaced and how the new components can be integrated with the existing system.
Romtec Utilities works across municipal, private, commercial, industrial, retrofit, and replacement projects, allowing pumps to be created in accordance with the specific operating and ownership requirements of each project.
Stormwater has rules that are different
The top developers of stromwater systems using the search terms provided must tackle a totally different hydraulic issue. Stormwater systems may experience significant changes in volume depending on the quantity of rain, drainage area capacities for detention and discharge rates.
Stations that are serving detention basins for instance, may need to temporarily store runoff before pumping it out at a steady pace. Engineers need to consider the flow, head conditions needs for flood management, environmental conditions and the nature of the drainage system receiving it.
Prefabrication can move work away from the site of work
Complex field assembly can create opportunities for conflicting schedules, installation errors or change orders and delays. Romtec Utilities uses substantial prefabrication before bringing equipment to the site of the project.
By completing more assembly and quality control work in a controlled environment this can decrease the amount of work required in the ground. In accordance with the plan approach that was outlined by Romtec Utilities, some projects that might otherwise require weeks to complete could be reduced to days according to the circumstances of the project.
Commissioning is a Part of Engineering Success
The assembly of all the components is not enough to make a system solid. Romtec Utilities offers installation advisors to help with the construction process that includes starting up and control panel inspections as well as pump operations, system testing and personnel training. Documentation is also provided to inform operators on how to maintain the system and consider future expansion.
This last stage is crucial for those who are looking for the top lift station design. Good engineering should produce more than a good set of sketches. It should leave the proprietor with a functioning system, trained personnel, useful documentation, and equipment built around the conditions the station is expected to face in its daily operations.